Finally got some work done on the vette!
#1
Drifting
Thread Starter
Member Since: Nov 2001
Location: Gettin crazy with the Cheez Whiz! OK
Posts: 1,804
Likes: 0
Received 0 Likes
on
0 Posts
Finally got some work done on the vette!
Well today I finally got the time to to some work to the vette. I rebuilt both parking brakes with new stainless hardware and shoes, replaced a stud that was broken on the left rear, put new trailing arm lines and hoses, put on new drilled rotors and new calipers and pads. Since I have already redone the front brakes I now have a nice brake system. One rear caliper and one front one had been leaking since I got the car and one parking brake was binding. Now I feel like I will have safe brakes when the car gets on the road (hopefully later this year), and maybe even a good base for the Hydraboost set-up :thumbs: Feels good to get some work done on the car since I have had to put it aside for so long. Now on to that leaky power steering....Hmm maybe a steeroids injection is in order. :steering: