BGA plant working overtime this week. Second shift to start July 6th

Thread Tools
 
Search this Thread
 
Old 06-24-2020, 09:32 PM
  #1  
c5vette73
Burning Brakes
Thread Starter
 
c5vette73's Avatar
 
Member Since: May 2000
Location: miami, florida, usa
Posts: 892
Likes: 0
Received 166 Likes on 90 Posts

Default BGA plant working overtime this week. Second shift to start July 6th

https://www.corvetteblogger.com/2020...uly-4th-break/
The following 3 users liked this post by c5vette73:
DJGold (07-05-2020), JerryU (06-25-2020), Sir Nuke (06-24-2020)
Old 06-24-2020, 09:41 PM
  #2  
CamsC8
Burning Brakes
Support Corvetteforum!
 
CamsC8's Avatar
 
Member Since: Aug 2019
Location: Toronto, Canada
Posts: 1,109
Received 933 Likes on 453 Posts
Default

Looks like we'll soon see who gets the first 2021 orders if this pace keeps up!
The following users liked this post:
charliebrown2 (06-26-2020)
Old 06-24-2020, 09:45 PM
  #3  
Sir Nuke
Drifting
 
Sir Nuke's Avatar
 
Member Since: Feb 2015
Location: West Columbia Texas
Posts: 1,421
Received 425 Likes on 245 Posts
Default

Old 06-24-2020, 10:06 PM
  #4  
Michael A
Le Mans Master
 
Michael A's Avatar
 
Member Since: Jun 2001
Location: CA
Posts: 9,645
Received 2,928 Likes on 1,366 Posts

Default

I have to wonder if the quality is going to suffer running people 10 hours a day. That's a long day on the assembly line.
Old 06-24-2020, 10:14 PM
  #5  
Red67John
Pro
 
Red67John's Avatar
 
Member Since: Feb 2016
Location: St. Louis area
Posts: 644
Received 394 Likes on 195 Posts
Default

Corvette assembly has traditionally involved overtime when needed to keep up with sales. In the olden days... They worked six day weeks when needed.
The following users liked this post:
MIREDVET (06-25-2020)
Old 06-24-2020, 10:30 PM
  #6  
Mitt11
Instructor
 
Mitt11's Avatar
 
Member Since: Aug 2019
Location: Salt Lake, Utah
Posts: 155
Received 116 Likes on 49 Posts
Default

Originally Posted by Michael A
I have to wonder if the quality is going to suffer running people 10 hours a day. That's a long day on the assembly line.
My opinion, which is shared with vast majority of my co workers working an aerospace manufacturing job, is that anything up to 12 hours isn't really noticeable. After that, people really start to drag.

Hopefully the BGA boys are nice and well rested after the long shut down, ready to work that OT.
The following 2 users liked this post by Mitt11:
427bob (07-06-2020), Sir Nuke (06-24-2020)
Old 06-24-2020, 10:42 PM
  #7  
Sir Nuke
Drifting
 
Sir Nuke's Avatar
 
Member Since: Feb 2015
Location: West Columbia Texas
Posts: 1,421
Received 425 Likes on 245 Posts
Default

Originally Posted by Michael A
I have to wonder if the quality is going to suffer running people 10 hours a day. That's a long day on the assembly line.
I've been working 10's since '93.....piece of cake.
The following 3 users liked this post by Sir Nuke:
charliebrown2 (06-26-2020), thrilled (06-25-2020), waynger (06-25-2020)
Old 06-24-2020, 11:52 PM
  #8  
Panfish
Melting Slicks
 
Panfish's Avatar
 
Member Since: Nov 2019
Posts: 2,313
Received 1,455 Likes on 838 Posts
Default

Originally Posted by CamsC8
Looks like we'll soon see who gets the first 2021 orders if this pace keeps up!
That would mean anyone whose 2020 order flops (a virtual certainty), will either go to the back of the line at that point or as is occurring almost daily now, 2021 TPW’s will be blowing around like the feather in Forrest Gump as they are slotted ahead of 2021 orders.

Last edited by Panfish; 06-24-2020 at 11:53 PM.
Old 06-25-2020, 05:36 AM
  #9  
C8 Vet Convertible
Advanced
 
C8 Vet Convertible's Avatar
 
Member Since: Feb 2020
Posts: 52
Received 22 Likes on 14 Posts
Default

Any news on the start of the HTC's? Is it still 8/20/20
Old 06-25-2020, 05:38 AM
  #10  
C8Jake
Race Director
 
C8Jake's Avatar
 
Member Since: Sep 2013
Location: ►SICAMOUS◄
Posts: 10,120
Received 5,416 Likes on 2,535 Posts
Default

Originally Posted by C8 Vet Convertible
Any news on the start of the HTC's? Is it still 8/20/20

Old 06-25-2020, 09:17 AM
  #11  
JillyBean
Burning Brakes
 
JillyBean's Avatar
 
Member Since: Mar 2020
Posts: 1,050
Received 668 Likes on 385 Posts
Default

Originally Posted by Panfish
That would mean anyone whose 2020 order flops (a virtual certainty), will either go to the back of the line at that point or as is occurring almost daily now, 2021 TPW’s will be blowing around like the feather in Forrest Gump as they are slotted ahead of 2021 orders.
lLooking more likely that all status 3000 orders will be built the way things seem to be going
Old 06-25-2020, 02:19 PM
  #12  
BigF6B
Drifting
 
BigF6B's Avatar
 
Member Since: Jun 2019
Location: Port Charlotte,Fl
Posts: 1,521
Received 564 Likes on 402 Posts
Default

Originally Posted by JillyBean
lLooking more likely that all status 3000 orders will be built the way things seem to be going
I'm thinking the day shift will go back to 8 hours a day if the 2nd shift starts up on 7/6/20 as reported on the Corvette Bolgger article. I'm keeping my fingers crossed it's accurate.
Old 06-25-2020, 05:00 PM
  #13  
E.T.D. Corvettes
Race Director
Support Corvetteforum!
 
E.T.D. Corvettes's Avatar
 
Member Since: Jun 2006
Location: Lawton, OK
Posts: 10,306
Received 9,531 Likes on 2,323 Posts
C7 & C8 Events Correspondent
Tech Contributor
2020 C8 of the Year Finalist - Unmodified
2020 Corvette of the Year (track prepared)
2020 Corvette of the Year Finalist (appearance mods)
C7 of Year Winner (appearance mods) 2019
2017 C7 of Year Finalist
2015 C7 of the Year
St. Jude Donor '14-'15-'16-'17-'18-'19

Default

Originally Posted by C8Jake
The only correct date on that is the order guide date. HTC production should begin well before August 20. 2021 SORP will most likely begin first week of November.
The following 2 users liked this post by E.T.D. Corvettes:
jcapps (06-26-2020), sparro (06-25-2020)
Old 06-25-2020, 05:01 PM
  #14  
E.T.D. Corvettes
Race Director
Support Corvetteforum!
 
E.T.D. Corvettes's Avatar
 
Member Since: Jun 2006
Location: Lawton, OK
Posts: 10,306
Received 9,531 Likes on 2,323 Posts
C7 & C8 Events Correspondent
Tech Contributor
2020 C8 of the Year Finalist - Unmodified
2020 Corvette of the Year (track prepared)
2020 Corvette of the Year Finalist (appearance mods)
C7 of Year Winner (appearance mods) 2019
2017 C7 of Year Finalist
2015 C7 of the Year
St. Jude Donor '14-'15-'16-'17-'18-'19

Default

I don't think second shift will start until July 13 at the earliest...
The following 3 users liked this post by E.T.D. Corvettes:
cam30era (06-26-2020), sparro (06-25-2020), V RED 08 (06-25-2020)
Old 06-25-2020, 05:05 PM
  #15  
C8J
Le Mans Master

 
C8J's Avatar
 
Member Since: Apr 2020
Posts: 6,154
Received 3,152 Likes on 1,717 Posts
Default

Originally Posted by jagamajajaran
I don't think second shift will start until July 13 at the earliest...
I guess I should modify the SS before it is updated for tomorrow?
Still doing 10 Hour First Shifts?

Last edited by C8J; 06-25-2020 at 05:06 PM.
Old 06-25-2020, 05:09 PM
  #16  
BigF6B
Drifting
 
BigF6B's Avatar
 
Member Since: Jun 2019
Location: Port Charlotte,Fl
Posts: 1,521
Received 564 Likes on 402 Posts
Default

Originally Posted by jagamajajaran
I don't think second shift will start until July 13 at the earliest...
I'll second that!!! much better than the end of August!!....
Old 06-25-2020, 05:12 PM
  #17  
thrilled
Safety Car
 
thrilled's Avatar
 
Member Since: Mar 2014
Location: Kilmarnock Va
Posts: 4,309
Received 620 Likes on 456 Posts

Default

With as many orders as there are I would have 3- 8 hour shifts. I imagine supply parts couldn’t keep up. Even 2 shifts their will be many that won’t get a 2020.

Get notified of new replies

To BGA plant working overtime this week. Second shift to start July 6th

Old 06-25-2020, 05:16 PM
  #18  
JillyBean
Burning Brakes
 
JillyBean's Avatar
 
Member Since: Mar 2020
Posts: 1,050
Received 668 Likes on 385 Posts
Default

Originally Posted by thrilled
With as many orders as there are I would have 3- 8 hour shifts. I imagine supply parts couldn’t keep up. Even 2 shifts their will be many that won’t get a 2020.
I’m going with all status 3000 get built as 2020’s
The following users liked this post:
C8broughtmeback (06-25-2020)
Old 06-25-2020, 05:32 PM
  #19  
E.T.D. Corvettes
Race Director
Support Corvetteforum!
 
E.T.D. Corvettes's Avatar
 
Member Since: Jun 2006
Location: Lawton, OK
Posts: 10,306
Received 9,531 Likes on 2,323 Posts
C7 & C8 Events Correspondent
Tech Contributor
2020 C8 of the Year Finalist - Unmodified
2020 Corvette of the Year (track prepared)
2020 Corvette of the Year Finalist (appearance mods)
C7 of Year Winner (appearance mods) 2019
2017 C7 of Year Finalist
2015 C7 of the Year
St. Jude Donor '14-'15-'16-'17-'18-'19

Default

Originally Posted by C8J
I guess I should modify the SS before it is updated for tomorrow?
Still doing 10 Hour First Shifts?
I think they'll go back to two 8s when the second shift starts.
Old 06-25-2020, 05:36 PM
  #20  
C8J
Le Mans Master

 
C8J's Avatar
 
Member Since: Apr 2020
Posts: 6,154
Received 3,152 Likes on 1,717 Posts
Default

Originally Posted by jagamajajaran
I think they'll go back to two 8s when the second shift starts.
I meant 10 hour first shifts continue until second starts or only 8 hour for first starting Friday?