BGA plant working overtime this week. Second shift to start July 6th
The following users liked this post:
E.T.D. Corvettes (06-25-2020)
#22
Melting Slicks
there union, 10 hours work is really 4, ask me how I know.
The following 2 users liked this post by nutsy:
2turbocobra (07-06-2020),
ArmchairArchitect (06-26-2020)
#23
Race Director
Member Since: Jun 2006
Location: Lawton, OK
Posts: 10,306
Received 9,531 Likes
on
2,323 Posts
C7 & C8 Events Correspondent
Tech Contributor
2020 C8 of the Year Finalist - Unmodified
2020 Corvette of the Year (track prepared)
2020 Corvette of the Year Finalist (appearance mods)
C7 of Year Winner (appearance mods) 2019
2017 C7 of Year Finalist
2015 C7 of the Year
St. Jude Donor '14-'15-'16-'17-'18-'19
#24
Le Mans Master
I used to work a 10/80 (10 hour days, every other Friday off). I much preferred it over a standard 8 hour work day workweek and so did the manufacturing floor people (once they realized they weren't going to get screwed out of overtime hours).
Last edited by RKCRLR; 06-25-2020 at 05:58 PM.
#26
The following users liked this post:
E.T.D. Corvettes (06-25-2020)
#27
Melting Slicks
#29
Instructor
#30
Team Owner
Member Since: Apr 2008
Location: Coloring within the lines
Posts: 27,422
Received 1,921 Likes
on
1,334 Posts
#31
#32
Race Director
The following 2 users liked this post by C8Jake:
C8 Vet Convertible (06-27-2020),
Racer86 (06-28-2020)
#35
Moderator
#36
Race Director
#37
Le Mans Master
Member Since: Apr 2013
Posts: 6,657
Received 4,116 Likes
on
1,470 Posts
2020 C8 of the Year Finalist - Unmodified
#38
Today's the 6th. Is the second shift still on schedule to work today?
#39
Race Director
#40
Race Director
Member Since: Jun 2006
Location: Lawton, OK
Posts: 10,306
Received 9,531 Likes
on
2,323 Posts
C7 & C8 Events Correspondent
Tech Contributor
2020 C8 of the Year Finalist - Unmodified
2020 Corvette of the Year (track prepared)
2020 Corvette of the Year Finalist (appearance mods)
C7 of Year Winner (appearance mods) 2019
2017 C7 of Year Finalist
2015 C7 of the Year
St. Jude Donor '14-'15-'16-'17-'18-'19
I had previously said I didn't think they would start a second shift today, and that turned out to be correct. I don't even know if they will start the second shift next week. Some of this depends on how well the suppliers were able to do last week while the Corvette plant was offline. Second shift is dependent upon suppliers at this point.
The following users liked this post:
jackfrostpdx (07-06-2020)