E Ray production
#1
Instructor
Thread Starter
E Ray production
I saw several posts that stated the roll out would be slow but this is a bit slower than I expected. Does anyone know why. I suspect it must be either a supply issue or some components are failing a QC test. I know that many are very anxious for that call from their dealer getting that allocation but for me I am hoping it is a few months out and I will enjoy my Stingray until that time.
#2
Race Director
I saw several posts that stated the roll out would be slow but this is a bit slower than I expected. Does anyone know why. I suspect it must be either a supply issue or some components are failing a QC test. I know that many are very anxious for that call from their dealer getting that allocation but for me I am hoping it is a few months out and I will enjoy my Stingray until that time.
The following users liked this post:
rackemup (03-24-2024)
The following users liked this post:
jpmotorsport (03-25-2024)
The following 2 users liked this post by /Bear/:
gmarcucio (03-25-2024),
Only1cannoli (03-27-2024)
#8
Instructor
I don’t think MacMulkin got any E-Ray allocations Feb or Mar. Your movement and mine lately have been to dropouts only. According to the other forum only 197 have been produce so far. Even if MM gets a large E-Ray allocation in April, those won’t be produced until Jun time frame. When does the corvette BG plant normally switch to the next model year Jun/Jul??? Originally I was at #154 and would be lucky enough to get a ‘24. Now at #126 it’s looking like it’ll be a ‘25. Chinese water torture.
The following users liked this post:
/Bear/ (03-24-2024)
#10
Le Mans Master
Member Since: Sep 2000
Location: Clouds Over California
Posts: 6,858
Received 440 Likes
on
237 Posts
I don’t think MacMulkin got any E-Ray allocations Feb or Mar. Your movement and mine lately have been to dropouts only. According to the other forum only 197 have been produce so far. Even if MM gets a large E-Ray allocation in April, those won’t be produced until Jun time frame. When does the corvette BG plant normally switch to the next model year Jun/Jul??? Originally I was at #154 and would be lucky enough to get a ‘24. Now at #126 it’s looking like it’ll be a ‘25. Chinese water torture.
The following users liked this post:
Lefty32 (03-24-2024)
#11
Racer
I don’t think MacMulkin got any E-Ray allocations Feb or Mar. Your movement and mine lately have been to dropouts only. According to the other forum only 197 have been produce so far. Even if MM gets a large E-Ray allocation in April, those won’t be produced until Jun time frame. When does the corvette BG plant normally switch to the next model year Jun/Jul??? Originally I was at #154 and would be lucky enough to get a ‘24. Now at #126 it’s looking like it’ll be a ‘25. Chinese water torture.
#12
I'm about to the point where I'm just going to say F-it and wait for a Zora.
#13
I don’t think MacMulkin got any E-Ray allocations Feb or Mar. Your movement and mine lately have been to dropouts only. According to the other forum only 197 have been produce so far. Even if MM gets a large E-Ray allocation in April, those won’t be produced until Jun time frame. When does the corvette BG plant normally switch to the next model year Jun/Jul??? Originally I was at #154 and would be lucky enough to get a ‘24. Now at #126 it’s looking like it’ll be a ‘25. Chinese water torture.
#14
#15
Melting Slicks
BG does not build 2 Zs or Es or I believe HTCs back to back for logistical reasons.Right hand drive are built in batches.
This has been well documated for a while now !
This has been well documated for a while now !
The following users liked this post:
Only1cannoli (03-27-2024)
#16
ERAYs are 0-7 a day and Z06 are 50-60/ day... so they can't E Station parts install takes too long and throttled as not to slow the line down is mt WAG
#17
Instructor
#18
#20