C6 Constraints for the production week of 8/02
#1
Former Vendor
Thread Starter
Member Since: Dec 2003
Location: East of Hot Lanta Ga
Posts: 3,006
Likes: 0
Received 0 Likes
on
0 Posts
St. Jude Donor '06
C6 Constraints for the production week of 8/02
1YY67 Convertible
C2L Roof Pkg.
1YY22 Coupe 1SX and 1SA
27U Precision Red Ext Color
C2L Roof Pkg.
1YY22 Coupe 1SX and 1SA
27U Precision Red Ext Color
#2
Safety Car
Re: C6 Constraints for the production week of 8/02 (Rick @ Les Stanford)
If they accepted your order, I would assume that there were no constraints on your build week? So hopefully my build week is 7/19 or 7/26.
#3
Race Director
Member Since: Dec 1999
Location: Westport, MA. www.tbyrnemotorsports.com - 1-877-4-TBYRNE
Posts: 13,459
Likes: 0
Received 1 Like
on
1 Post
St. Jude Donor '06-'07
Re: C6 Constraints for the production week of 8/02 (TedG)
Rick: I believe you have over 100 orders in but there are only 42 on the Customer Orders page. Does that mean those are at the top of the ordering list for allocations that will be coming up soon or the others just haven't beed added yet?
Thanks for all of the updates! I see why you guys are rated so highly!
Tom
Thanks for all of the updates! I see why you guys are rated so highly!
Tom
#4
Burning Brakes
Re: C6 Constraints for the production week of 8/02 (Rick @ Les Stanford)
Soooo is TedG correct....are there no constraints on these items until Production week 08/02?????
I had heard the Power Top and the two lower level option packages were on constraint from the get go.....the Roof package was not....Did that change...or does it start with the production week stated???
Pat
I had heard the Power Top and the two lower level option packages were on constraint from the get go.....the Roof package was not....Did that change...or does it start with the production week stated???
Pat
#5
Former Vendor
Thread Starter
Member Since: Dec 2003
Location: East of Hot Lanta Ga
Posts: 3,006
Likes: 0
Received 0 Likes
on
0 Posts
St. Jude Donor '06
Re: C6 Constraints for the production week of 8/02 (tbyrne)
Rick: I believe you have over 100 orders in but there are only 42 on the Customer Orders page. Does that mean those are at the top of the ordering list for allocations that will be coming up soon or the others just haven't beed added yet?
Thanks for all of the updates! I see why you guys are rated so highly!
Tom
Thanks for all of the updates! I see why you guys are rated so highly!
Tom
[Modified by Rick @ Les Stanford, 4:35 PM 6/17/2004]
#6
Former Vendor
Thread Starter
Member Since: Dec 2003
Location: East of Hot Lanta Ga
Posts: 3,006
Likes: 0
Received 0 Likes
on
0 Posts
St. Jude Donor '06
Re: C6 Constraints for the production week of 8/02 (Pat Salerno)
Soooo is TedG correct....are there no constraints on these items until Production week 08/02?????
I had heard the Power Top and the two lower level option packages were on constraint from the get go.....the Roof package was not....Did that change...or does it start with the production week stated???
Pat
I had heard the Power Top and the two lower level option packages were on constraint from the get go.....the Roof package was not....Did that change...or does it start with the production week stated???
Pat
#8
Former Vendor
Thread Starter
Member Since: Dec 2003
Location: East of Hot Lanta Ga
Posts: 3,006
Likes: 0
Received 0 Likes
on
0 Posts
St. Jude Donor '06
Re: C6 Constraints for the production week of 8/02 (Pat Salerno)
Rick, Thanks for the clarification....Pat
CONVERTIBLE
1SX & 1SA PKG. CPE
#9
Safety Car
Re: C6 Constraints for the production week of 8/02 (Rick @ Les Stanford)
The information we don't seem to have is A TPW. Again I am assuming that because my order was placed against their allocation it was scheduled for production and there were no constraints. Am I correct???
Here is my Event history.
3000 Accepted by Production Control 2004-06-16
2500 Preferenced 2004-06-15
2000 Accepted by GM 2004-06-14
2050 Order Changed 2004-04-27
1100 Preliminary Order Accepted 2004-04-17
1101 Preliminary Order Added 2004-04-17
There is some other stuff like end date and system source and process ID but this is the gist of it.
[Modified by TedG, 6:22 PM 6/17/2004]
Here is my Event history.
3000 Accepted by Production Control 2004-06-16
2500 Preferenced 2004-06-15
2000 Accepted by GM 2004-06-14
2050 Order Changed 2004-04-27
1100 Preliminary Order Accepted 2004-04-17
1101 Preliminary Order Added 2004-04-17
There is some other stuff like end date and system source and process ID but this is the gist of it.
[Modified by TedG, 6:22 PM 6/17/2004]
#10
Re: C6 Constraints for the production week of 8/02 (TedG)
So Rick,
Do you think we can read anything into that Precision Red Constraint (changing tint?)? ... or is this just SOP activities?
Do you think we can read anything into that Precision Red Constraint (changing tint?)? ... or is this just SOP activities?
#11
Safety Car
Re: C6 Constraints for the production week of 8/02 (LongTimer)
So Rick,
Do you think we can read anything into that Precision Red Constraint (changing tint?)? ... or is this just SOP activities?
Do you think we can read anything into that Precision Red Constraint (changing tint?)? ... or is this just SOP activities?
#12
Advanced
Member Since: Apr 2004
Location: Glendale AZ
Posts: 56
Likes: 0
Received 0 Likes
on
0 Posts
Re: C6 Constraints for the production week of 8/02 (LongTimer)
I received the call today for my "actual" order! I was given the six digit GM order code and the estimated target production date of 8/2. The original color I picked, Precision Red, is not available for the 2nd week of production. I changed the color to Machine Silver. I am upset because I really liked this red over the torch red it had replaced.
Questions:
1) If Precision Red is removed from the constraint list in the future, can my order be changed?
2) What will be the latest day it can be changed?
3) How can this color be on constraint so fast?
[Modified by AZ_Vettes, 8:35 PM 6/17/2004]
Questions:
1) If Precision Red is removed from the constraint list in the future, can my order be changed?
2) What will be the latest day it can be changed?
3) How can this color be on constraint so fast?
[Modified by AZ_Vettes, 8:35 PM 6/17/2004]
#13
Race Director
Member Since: Dec 1999
Location: Westport, MA. www.tbyrnemotorsports.com - 1-877-4-TBYRNE
Posts: 13,459
Likes: 0
Received 1 Like
on
1 Post
St. Jude Donor '06-'07
Re: C6 Constraints for the production week of 8/02 (Rick @ Les Stanford)
All of them have not been posted yet and about 30 are for the 06 C6 Z06
#14
Safety Car
Re: C6 Constraints for the production week of 8/02 (AZ_Vettes)
I received the call today for my "actual" order! I was given the six digit GM order code and the estimated target production date of 8/2. The original color I picked, Precision Red, is not available for the 2nd week of production. I changed the color to Machine Silver. I am upset because I really liked this red over the torch red it had replaced.
Questions:
1) If Precision Red is removed from the constraint list in the future, can my order be changed?
2) What will be the latest day it can be changed?
3) How can this color be on constraint so fast?
Questions:
1) If Precision Red is removed from the constraint list in the future, can my order be changed?
2) What will be the latest day it can be changed?
3) How can this color be on constraint so fast?
I would guess that if your TPW is 8/02, you can no longer change it.
Some weeks they only make certain colors. Maybe this is a Mag Red, Mil Yellow week.
[Modified by fdxpilot, 2:25 PM 6/18/2004]